Dean and Gina

Our Life and Adventures

HRV Pipes

By: Gina

March 23, 2014

My mom came up this weekend and we took the opportunity of the extra help to install the HRV pipes.

Exhaust portion in the bathrooms.

Looking through the media room floor.  The pipes are traveling through the truss space and up into the media room.

Mom vacuumed up some of the floor for us.

After we finished the HRV pipes mom and I installed low voltage wire.

Our very first exterior light!

Back to top.